TC Operations Forecast

Constraint-led planning workspace

Live scenario

See what the bins can actually process.

A daily cohort model for collection, 14-day sealed treatment, maturity, pickup, warehouse holding, and revenue. Intake claims never bypass physical bin capacity.

constrained

Accepted raw

40 t

7% of 540 t offered

Turned away

500 t

Demand lost to occupied bins

Saleable output

13.7 t

Target 13.7 t / month

Peak bins used

800

800 installed across 2 TCs

Truck trips

4

4.3 t effective payload

Logistics + storage

RM 17,520

Trips, handling and warehouse lease

Primary bottleneck

Sealed-bin storage

Secure 921.6 m² of compliant sealed-bin space before ordering the full bin expansion.

Incremental bin capex

RM 345,600

Model rule

400 bins = one 10 t batch

Sealed bins cannot receive new waste for 14 days.

Demand cannot outrun hardware

Monthly raw waste offered versus physically accepted.

12 months
Launch bin utilisation

Peak occupancy in Oct 2026.

Installed800
Continuous-flow need12,320
Surge gap11,520
01

Collect

10 t successful-day target per TC

Bins are filled and sealed as a dated cohort.

02

Hold

14 days unavailable

No new food waste enters occupied bins.

03

Pick up

4 trips in Oct 2026

Bins release only as mature compost leaves the TC.